IN PROGRESS

Sports Hall in Plužine

Location

Plužine

Construction of a Sports Hall in Plužine

Location: Plužine
Investor: Municipality of Plužine, contracting authority: Ministry of Public Works
Status: Avgust 2024 – in progress
Project value: 4,723,032.71 € including VAT

The project involves the construction of a public facility – an enclosed sports hall with a ground floor and two upper floors (P+2), with a total gross floor area of 2,985.63 m². Large glazed openings are planned on the front façade, in accordance with modern design principles, providing improved natural lighting and solar exposure of the building. Aluminium-framed windows and doors are planned. All façades are clad with sandwich panels, while the side entrances are recessed. The building has a single-pitch roof with a steel roof substructure covered with roofing sandwich panels.

Location

Plužine

             

Building type

Building construction

Completion

in progress

Pluzine dvorana izgradnja (1)
Pluzine dvorana izgradnja (2)
Pluzine dvorana izgradnja (3)
Pluzine dvorana izgradnja (4)
Pluzine dvorana izgradnja (5)
Pluzine dvorana izgradnja (6)
Pluzine dvorana izgradnja (7)
Pluzine dvorana izgradnja (8)
Pluzine dvorana izgradnja (9)
Pluzine dvorana izgradnja (10)
Pluzine dvorana izgradnja (11)
Pluzine dvorana izgradnja (12)
Pluzine dvorana izgradnja (13)
Pluzine dvorana izgradnja (14)
Pluzine dvorana izgradnja (15)
Pluzine dvorana izgradnja (16)
Pluzine dvorana render (1)_
Pluzine dvorana render (2)_
Pluzine dvorana render (3)