The building consists of two parts, total base area 560 m2 and floors P + 4 and is located within the hotel complex on the seashore. The following works are executed: demolition of the interior of the building, roofing works, facade works, locksmith and carpentry works, plaster works, ceramic works, water and sewer installations, strong and low-voltage installations, thermotechnical and sprinkler installations, etc.