The object is a vehicle-pedestrian road of approx. length 760 m. The width of the road is 2 x 2.75 m with a two-sided pavement total width of 1.50 m. In addition to construction works, works on water supply, atmospheric and faecal sewage, electrical installations and traffic signaling are also being performed.