Works on the construction of a pedestrian bridge over the Podgorica - Bijelo Polje main road, in the municipality of Mojkovac – phase I. Work on the construction of a reinforced concrete structure consisting of a main bridge and a descending ramp were carried out. The main bridge is 7.00 m wide and 62.65 m long and crosses the main highway Podgorica - Bijelo Polje, as well as the pedestrian-bicycle path. The descent ramp is 5.00 m wide and 176.66 m long and is located at the end of the bridge.