Construction works on the bridge over the Sitnica river (on the project of reconstruction of the main road M-2.3 Podgorica - Cetinje from Cetinje traffic lights to the bridge on Sitnica, in the length of 3,3km - construction of a boulevard)
Works on the rehabilitation of the existing bridge and the construction of a new one, were carried out to expand the carriageway with two to four lanes. The new bridge is a 44 m range, with pre-stressed shafts and four pillars including coastal pillars. On the existing bridge, the reinforcement of the span construction with carbon strips and injection of cracks is done.