Construction of the square and promenade in Sutomore - Phase I, Municipality of Bar

2021
Sutomore
INVESTOR:
Municipality of Bar "Public Enterprise for Management of Marine Assets of Montenegro" Budva and Directorate of Public Works Podgorica

Short description

Reconstruction of the coastal zone

 

In Phase II of the project, a circular square with a monument, a ramp, standard elements, retaining and fencing walls were treated.

 

The entire surface of the mentioned space is paved with vibropressed precast concrete slabs with crushed dolomite and river quartz.

The space intended for the terraces of catering facilities is planned to be formed by a series of reinforced concrete pillars connected in frames by an AB beam with a reinforced concrete foundation strip, forming a colonnade that linearly marks the space and gives it character.

The extreme eastern part of this move is a free space with green areas and benches.

Also, on the east side, this move ends with a newly designed staircase and a ramp for access to the beach.

The circular square is planned as a circular extension of the pedestrian zone. Around it, on two sides, is positioned greenery with typical polycystic benches.