Short description

The building is based on piles in the total length of 198.00 m (18 piles of 11.00 m).

Overpass length: 140.00 m (7 spans of 20 m each) + 27 m ( fitting into the local street) = a total of 167 meters.

In cross section of 9 girders (7 spans x 9 girders = 63 girders in total).

Overpass area 1,582.00 m2.

Total width in cross section = 11.30 m.

It is planned to install:

Armature = 259 tons,

Prestressing steel = 25 tons,

Concrete (MB 30, MB 40, MB 45) = about 2,000.00 m3.